Standard Description
Equipped with the zero leak bidirectional checking sole-noid valves, this electrical power unit is built for your operation of two independent circuits. Which are respectively to the most important and subordinate platforms of the double scissors lift. Two cut-off valves are made use of for reducing the machine manually in case of energy loss. If far more independent circuits are needed for the application please make contact with us for availability.
Remark: one. Please seek the advice of our revenue engineer to the distinct pump displacement, motor energy or tank capacity.
two. CSA or UL certified motors can be found on request.
Specific Notes
1. The AC motor is of S3 duty cycle, which might only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean every one of the hydraulic parts concerned just before installation of the power unit.
3. Viscosity with the oil shoud be 15~46 cst,as well as oil ought to be clean and absolutely free of impurities,N46 hydraulic oil is recommended.
four. The power unit need to be mounted vertically.
five. Check the oil degree inside the tank right after the first operating of the electrical power unit.
six. Oil changing is required following the first one hundred operation hrs,afterwards once every 3000 hrs.